Fairfield School
We were commissioned as Lead Consultant to co-ordinate the design and construction of a substantial education investment at Fairfield primary…
We were commissioned as Lead Consultant to co-ordinate the design and construction of a substantial education investment at Fairfield primary…
In 2017 Arcus prepared a feasibility study for the Client to consider the feasibility and costs associated with demolishing the…
Westec in Omskirk is a new build scheme of 27 units, comprising 8 flats and 27 detached and semi detached…
Arcus were employed by the Stonewater Group to take forward an outline design to link two adjacent 1980’s sheltered housing…
Arcus was appointed to remodel the existing school and to provide a new-build ‘foundation unit’ that would create well-defined teaching…
A design might look good on paper, but how it works in the real world is what’s important...